Short answer: Minimum order quantities and lead times depend on product and mill load, so buyers plan repeat orders, pool volume to meet MOQ and confirm lead time before contract, with sourcing help in our Metal Sourcing Supplier and quotation detail in our Price Quotation Guide.
At a Glance

What Drives MOQ
Product and mill load set MOQ; source from our Steel Coil Supplier, Steel Plate Supplier, Stainless Steel Supplier ve Aluminum Supplier; a quick summary is below.
| Product | ADEDI | Kurşun |
|---|---|---|
| Hot coil | 25 t | 15-25 d |
| Plate | 5 t | 20-35 d |
| Stainless | 1 t | 25-40 d |
Lead Time Factors
Heat treatment and finishing add time, with methods in our Heat Treatment Guide and our Surface Treatment Guide, plus machining in our Machining Guide.
Planning Repeat Orders
Pool volume via our Metal Sourcing Supplier and the steps in our Import Steel Guide.
Reducing Delay Risk
Verify early with our Third-Party Inspection Guide and our Quality Inspection Guide.
Get a Quote
Tell HXSCO your requirements and we will respond with a competitive quote and lead time.
Sıkça Sorulan Sorular
Coil about 25 t; plate about 5 t; stainless about 1 t.
25 to 40 days typical.
Pool with other items via consolidation.
Mill load, heat treatment, inspection.
Forecast and place repeat orders early.
Plan Your Metal Orders with HXSCO
HXSCO confirms MOQ and lead time and consolidates volume to meet mill minimums. Send your forecast for a plan.